this post was submitted on 23 Dec 2024
723 points (99.1% liked)

World News

39390 readers
2384 users here now

A community for discussing events around the World

Rules:

Similarly, if you see posts along these lines, do not engage. Report them, block them, and live a happier life than they do. We see too many slapfights that boil down to "Mom! He's bugging me!" and "I'm not touching you!" Going forward, slapfights will result in removed comments and temp bans to cool off.

We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.

All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.


Lemmy World Partners

News !news@lemmy.world

Politics !politics@lemmy.world

World Politics !globalpolitics@lemmy.world


Recommendations

For Firefox users, there is media bias / propaganda / fact check plugin.

https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/

founded 2 years ago
MODERATORS
 

Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

you are viewing a single comment's thread
view the rest of the comments
[–] varyingExpertise@feddit.org 2 points 1 day ago

Its the fact that we are mandated to sell the excess to EU before we take care of our own.

That doesn't really work that way and there is no forcing involved. Capacity is sold by the power plant operators and bought by the power companies who resell it then. As long as neighbouring zones pay more than Southern Sweden, power plant operators in Southern Sweden will sell their generation capacity at that higher price because they are not a charity but for profit companies.

Now, grid operators in Southern Sweden could show them the middle finger and buy capacity from Central Sweden, but that's apparently not possible because not enough power lines exist to actually transfer the energy from there. So, grid operators in the South are stuck with the higher prices that someone else pays as well.

And even if you just want to blame the Germans for everything, check the distribution of exports from the South Sweden zone before making that claim: https://app.electricitymaps.com/