Stenciling says "6 & 7TH / PDE & 3RD" It's the only pink tie on this track.

you are viewing a single comment's thread
view the rest of the comments
[–] markstos@lemmy.world 29 points 9 months ago (2 children)

It’s marking the joint between two track segments. Look just above it. On both tracks there’s a series of bolts indicating that two track segments have been bolted together.

Not sure why the other joints aren’t marked.

[–] perviouslyiner@lemmy.world 9 points 9 months ago* (last edited 9 months ago) (1 children)

if that was an insulated joint for track circuit separation there would be cables attached at each side and the two bolted plates would be aligned?

[–] Darkassassin07@lemmy.ca 8 points 9 months ago (1 children)

You can see 3-4 wires connected on either side of the plates.

I'm not sure if those particular plates are insulating connections though. Doesn't really look like it, but I'm no expert on rail connections.

[–] perviouslyiner@lemmy.world 2 points 9 months ago* (last edited 9 months ago)

good spot, those wires are smaller than I am used to seeing - so it is a track circuit boundary as well as whatever the pink means.

[–] chaogomu@kbin.social 8 points 9 months ago

Rail is most often welded together, not joined like this.

So you likely don't need more than one marking.