this post was submitted on 30 Aug 2023
1581 points (94.0% liked)

World News

39099 readers
2428 users here now

A community for discussing events around the World

Rules:

Similarly, if you see posts along these lines, do not engage. Report them, block them, and live a happier life than they do. We see too many slapfights that boil down to "Mom! He's bugging me!" and "I'm not touching you!" Going forward, slapfights will result in removed comments and temp bans to cool off.

We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.

All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.


Lemmy World Partners

News !news@lemmy.world

Politics !politics@lemmy.world

World Politics !globalpolitics@lemmy.world


Recommendations

For Firefox users, there is media bias / propaganda / fact check plugin.

https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] abraxas@lemmy.ml 5 points 1 year ago (1 children)

And yet you made simple mistakes like assuming that nuclear reactors only last 40 years?

No. No I didn't. I was using the lowest life expectancy for nuclear because it steelmanned nuclear for my other critiques. You want to use longer ages, that means you're prepaying 60% of that longer age at cost. I find it interesting that you called me out on trying to give nuclear more benefit. That said, IAEA holds with 30-40 year life expectancy on a nuclear plant so I think the steel-man I chose is acceptable.

What magic technology have we invented? You realize that lithium ion batteries are 1980’s technology right?

Lithium Ion batteries are being used at large scale now, sure. It's dishonest to say the ones being built today for utility-scale power are 1980's technology, just as it's dishonest to pretend that nuclear power is what it was in the 1950's. But there are also advancements in molten sand batteries, and even utility scale water energy storage is going down in price (though I believe it's still slightly more expensive than nuclear).

Yes, that’s what I said. Remember we’re in it for long term solutions. Not bullshit hand-wavy nonsense.

So how is $140/MWH total cost of energy over the life of a nuclear plant "the long haul" over $77/MWH total cost of energy over the life of a nuclear farm? Do we need to discuss how that kind of math works? Building solar+battery plants, running them till EOL, rebuilding them from scratch and repeating several times is still **half ** as expensive as producing the same amount of energy with a nuclear plant until it reaches EOL.

And considering that cost is effectively more like $1,000/MWH or more for the first few years, how exactly are we going to get carbon neutral any time soon by literally adding an order of magnitude to our costs?

Yes 100,000 little projects vs 1…

Sure. Being able to plop it down at a massively high price does have its uses. Note I said there CAN be appropriate uses for nuclear. Just not many of them. The price is just unreasonable. And very often, space isn't really an issue. Those 100,000 little projects are still cheaper than that 1 project nuclear for the amount of energy created.

And I’m not even Anti-solar… after all it’s literally just second-hand nuclear production… But it’s just that. Second-hand, and why settle for “Second” when we can harness first hand?

For several reasons. First, the sun is in a state of nuclear fusion which is at least 4x more efficient than can be achieved with fission. Second, the sun is gonna burn whether we harvest that energy or not. Third, the most expensive part of a any nuclear power prospect is causing and containing it. We get to skip that step with solar.

I’m just not dumb enough to assume it’s the answer to all our problems

I guess I am "dumb enough". Between the power created from the sunlight itself, and wind and hydroelectric power created indirectly by it. The numbers all work out.

[–] Getawombatupya@aussie.zone 0 points 1 year ago (1 children)

How much of that $140 is labour?

[–] PersnickityPenguin@lemm.ee -1 points 1 year ago (1 children)

Probably a third of that cost is tied up in NRA certification with 32 different federal and state licensing bodies, planning, EIS statements which average 6 years to write, and the political approval process.

While you're waiting those six to 10 years to get your project started, you're going to see a construction cost inflation rate of what, 25 to 30%?

[–] abraxas@lemmy.ml 1 points 1 year ago (1 children)

Care to substantiate that the red tape amounts to more than 100 years worth of the same MWH of solar? Or is that just your gut feeling?

Also note, even if the construction cost were 30% inflated, nuclear is still losing handily to solar by the figures I cited.

[–] PersnickityPenguin@lemm.ee 1 points 1 year ago* (last edited 1 year ago) (1 children)

I was half joking, although cost escalation would actually account for a major portion of the cost increase.

We did a new building project. Started during 2021, and by the time we received the final bids costs had increased 50%. All within 6 months. We're at 10% cost escalation this year alone.

Imagine 6 years of that.

However, it also sounded like these companies had no clue what they were doing. Similar to California High Speed Rail.

[–] abraxas@lemmy.ml 2 points 1 year ago (1 children)

Of course. That happens. Luckily, we have countries like China with less red tape to use to measure. They've been building a lot of nuclear and solar. Their end-to-end solar looks like around $750M per GW (possibly including storage? Not sure. About $2.2B for a 3.3GW plant). Looks like they're spending about $5B per GW of nuclear.

Sorry I don't have the solar reference anymore. I was building a math equation for another comment and realized they weren't talking price, so scrapped it without thinking.

Since those numbers seem to match US figures, I think people in the Western World forget that a lot of bid cost increases or "escalations" are due to the fact that companies try to low-bid to win the contract, knowing every little inconvenience will require a cost increase. It evens out more than people want to admit.

[–] PersnickityPenguin@lemm.ee 1 points 1 year ago (1 children)

Yeah I hate dealing with that. Then they send back every design decision to be reopened, resulting in literally years the meetings to decide which source for which equipment, all the while the Costco up to the point where if we just built a damn thing 5 years ago then it would have been cheaper than trying to go with a low bid now. Not to mention years of delays.

[–] abraxas@lemmy.ml 1 points 1 year ago

Agreed. It doesn't end up saving a penny, but it definitely leads to greased wheels along the way and richer politicians.