this post was submitted on 13 Sep 2023
999 points (95.7% liked)

Technology

59311 readers
6242 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

Back on Christmas Eve of last year there were some reports that Elon Musk was in the process of shutting down Twitter’s Sacramento data center. In that article, a number of ex-Twitter employees wer…

you are viewing a single comment's thread
view the rest of the comments
[–] IphtashuFitz@lemmy.world 160 points 1 year ago (17 children)

I’m shocked that the data center required retinal scans but that the employee with access could then just hold the door and let him and others in.

I used to work at a data center with lots of security. To get into the area with the servers you had to go through a man trap. It was a room a little larger than a telephone booth with automatic doors on both sides. To open the first door you needed a physical card key. Once inside the door closed, then to open the inner door you needed to both enter a PIN and have your hand scanned in a biometric scanner. Only after all that could you get inside. The booth also weighed you, and if your weight was off by a certain amount after your last pass through then it wouldn’t let you in. That was to prevent somebody from piggybacking with you.

[–] redcalcium@lemmy.institute 18 points 1 year ago* (last edited 1 year ago) (4 children)

How do you get big equipments (e.g.a pallet of server components, or a whole rack of new servers) into the area?

[–] noride@lemm.ee 24 points 1 year ago* (last edited 1 year ago) (1 children)

Separate double bay doors. They have a pair for each floor that opens to an outside wall. You use a forklift to get the pallets up. That or there is a big ass freight elevator, depending on the data center.

load more comments (2 replies)
load more comments (14 replies)